Norwest Quarter Stage 1 Building B (L2-L12)

Norwest Quarter Stage 1 Building B (L2-L12)

  • Design Scope: Facade engineering services. Class 2
  • Address: 40 Solent Circuit Norwest NSW 2153
  • Architect: Smart Design Studio

All images courtesy to the architect.

CGS Façade Engineering was engaged to provide façade engineering services for the development of Norwest Quarter consisting of Stage 1, including building B (L2-L12) and building C (L3-L22).

CGS Façade Engineering developed a performance solution for Building B (L2-L12), pertaining to general façade specification |wind load calculations | architectural drawing reviews | waterproofing | termination height | brick system | façade thermal bridging & condensation | design certification | weatherproofing | window shop drawing review | PBDB | external light steel stud wall design.

Residents of building B, a mixed-use building containing shop and retail use over two levels and residential apartments over fourteen levels, will enjoy a bright sanctuary surrounded by vibrant pockets of shops, restaurants and cafes.

Once complete, both residential buildings will transform a vibrant town centre for over 2,000 residents who look to being a part of a leafy neighbourhood.