CGS Façade Engineering is thrilled to announce our façade project for the Tallawong Station Precinct.
CGS Façade Engineering has been engaged to provide façade engineering services for the development consisting of Stage 2 & 3, for the efficient design and development of the external façade envelope. This is the barrier separating the outside from the inside.
In response to community feedback provided by the developer, the façade for these modern residences stays true to Tallawong’s unique local character.
Residents of this precinct will not only have access to retail and green public open spaces – but the now terminus of the new Sydney Metro rail line – which connects the northwest region to the existing Transport for NSW rail network and over 37,000 daily commuters. Offering an intentional lifestyle within a highly walkable and connected precinct.
Images courtesy to the architect, Turner Studio.